PROJECT INFORMATION
Project ID: 02L  Project Layout
Project Name: Comite Drive
City Parish Project No: 02-CS-HC-0001
DOTD Project No: 817-31-0007
Design Engineer: SJB Group, LLC
Project Limits: Plank Road to Comite River
Project Linear Footage: 11517
Detailed Description: The Comite River project will provide a three lane curb and gutter concrete roadway that will have sidewalks on both sides of the road and a widened six foot shoulder than can be used for bicycles. The project also includes sanitary sewer and a new 125 ft long bridge over White Bayou. This road project will provide an improved west-east connection between Hooper Road and Plank Road.
Project Budget: Present Day Cost $21,600,000.00
Project Files:
Project
Summary
Photo
Gallery

PROJECT SCHEDULE
Planning 100% Design 100% ROW 100% Construction 15%
                         
Project Progress: The contractor has finished driving the piles at the bridge. Contractor has completed installing the subsurface drainage line on the north side of the road between Plank Road and the bridge.
Project Look Ahead: The contractor will continue building the new bridge, installing subsurface drainage pipe, and testing the new sanitary sewer system.

CONSTRUCTION INFORMATION
Contractor Name: J. B. James Construction, LLC
Construction Amount: $12,089,170.40
Construction Duration: 330 Calendar Days
Construction Start Date: 11/15/2009
Construction End Date: 12/10/2010