Stumberg Extension

PROJECT INFORMATION
Project ID: AA  Project Layout
Project Name: Stumberg Extension
City Parish Project No: 03-CS-HC-0021
DOTD Project No: TBD
Design Engineer: HNTB Corporation
Project Limits: Airline Highway to Jefferson Highway
Project Linear Footage: 5700
Detailed Description: This project will extend an existing project on Stumberg Lane (from Jefferson Highway to Coursey Boulevard) to Airline Highway. It will connect to the proposed Pecue Lane project and improvements at Airline Highway. The project will require a new bridge crossing over Clay Cut Bayou. The roadway will be raised by placing fill along the route. When combined with other projects in the plan, it will provide an improved north-south connection extending from Perkins Road to Coursey Boulevard.
Project Budget: Present Day Cost $18,974,382.00
Project Files:
Project
Summary
Photo
Gallery

PROJECT SCHEDULE
Planning 100% Design 85% ROW 0% Construction 0%
                                                             
Project Progress: The design consultant has submitted 90% final plans. These 90% plans have been reviewed and comments have been sent back to the design consultant.
Project Look Ahead: The design consultant will prepare right of way maps and prepare 100% final plans.