Downtown Signalization

PROJECT INFORMATION
Project ID: EE  Project Layout
Project Name: Downtown Signalization
City Parish Project No: 06-CS-HC-0012
DOTD Project No: N/A
Design Engineer: ABMB Engineers, Inc.
Project Limits: Downtown (30 Locations)
Project Linear Footage: 0
Detailed Description: This project will upgrade traffic signals and communications at twenty-nine (29) intersections and one (1) pedestrian crosswalk in the downtown area of Baton Rouge. Signal equipment upgrades, handicap sidewalk ramp construction, and interconnection of signals are included in the project.
Project Budget: Present Day Cost $11,409,898.00
2007 Estimates
Project Files:
Project
Summary
Photo
Gallery

PROJECT SCHEDULE
Planning 100% Design 100% ROW 100% Construction 100%
       
Project Progress: Project is completed and the ribbon cutting ceremony was held December 10, 2009.
Project Look Ahead:

CONSTRUCTION INFORMATION
Contractor Name: E. P. Breaux, Electrical, Inc.
Construction Amount: 9,888,610.50
Construction Duration: 450 days
Construction Start Date: 6/6/2008
Construction End Date: 10/28/2009