Project ID: J  Project Layout
Project Name: Hooper Road
City Parish Project No: 08-TL-HC-0034
DOTD Project No: 225-02-0038
Design Engineer: TBD
Project Limits: 2,800' east of Blackwater Road to Joor Road
Project Linear Footage: 9102
Detailed Description: The project will widen Hooper Road to provide two through lanes in each direction and a raised median from Joor Road to approximately 2800' east of Blackwater Road. This project will provide an improved east-west corridor connecting I-110, Harding Boulevard, Joor Road, and Sullivan Road.
Project Budget: Present Day Cost $29,362,918.00
Project Files:
Project
Summary
Photo
Gallery

PROJECT SCHEDULE
Planning 90% Design 10% ROW 0% Construction 0%
                                                                               
Project Progress: The Final Sewer Design Study was submitted in December 2009.
Project Look Ahead: The Final Sewer Design Study was reviewed by GLP in January 2010. Final Plans are contingent on approval of funding and will be incorporated into the Hooper Sullivan project.