PROJECT PROGRESS



Glen Oaks Drive

PROJECT INFORMATION
Project ID: KK  Project Layout
Project Name: Glen Oaks Drive
City Parish Project No: TBD
DOTD Project No: TBD
Design Engineer: TBD
Project Limits: Plank Road to 500' east of McClelland Drive
Project Linear Footage: 4560
Detailed Description: Glen Oaks Drive is currently a two lane roadway without shoulders from Plank Road to McClelland Drive. The proposed typical section is a three lane curb and gutter roadway with sidewalks on one side and bike lanes on both sides. Due to the houses along the roadway, the proposed sidewalk will be located at the back of curb allowing the roadway to fit in the existing 50-foot right of way width.
Project Budget: Present Day Cost $9,903,902.00
Project Files:
Project
Summary
Photo
Gallery

PROJECT SCHEDULE
Planning 50% Design 0% ROW 0% Construction 0%
                                                                               
Project Progress: This project remains in the early planning stages.
Project Look Ahead: