| Project Limits: |
750' north of Wimbush Drive to Lower Zachary Road |
| Project Linear Footage: |
13240 |
| Detailed Description: |
This project will replace a narrow two lane open ditch limestone and/or asphalt roadway with a two lane roadway with shoulders and open ditches. The project will also improve the horizontal alignment requiring a new bridge crossing of South/Baker Canal along with a new vertical alignment raising the roadway to allow access into and out of the area during periods of heavy rainfall. |
| Project Budget: |
Present Day Cost $6,379,049.00
|