McHugh Road

PROJECT INFORMATION
Project ID: N  Project Layout
Project Name: McHugh Road
City Parish Project No: 02-PR-CI-0034
DOTD Project No: N/A
Design Engineer: CSRS, Inc.
Project Limits: 750' north of Wimbush Drive to Lower Zachary Road
Project Linear Footage: 13240
Detailed Description: This project will replace a narrow two lane open ditch limestone and/or asphalt roadway with a two lane roadway with shoulders and open ditches. The project will also improve the horizontal alignment requiring a new bridge crossing of South/Baker Canal along with a new vertical alignment raising the roadway to allow access into and out of the area during periods of heavy rainfall.
Project Budget: Present Day Cost $6,379,049.00
Project Files:
Project
Summary
Photo
Gallery

PROJECT SCHEDULE
Planning 100% Design 100% ROW 100% Construction 0%
                         
Project Progress: The design of McHugh has been completed and is in the final review stage. All required right of way has been acquired.
Project Look Ahead: The construction is currently on hold. A letting schedule for this project has not yet been determined.

Secure Login For questions and comments about this Green Light Plan project, please send email requests to Kimberlie Wessman at wessman@csrsonline.com or use our online feedback form.