Seyburn Drive Extension

PROJECT INFORMATION
Project ID: W  Project Layout
Project Name: Seyburn Drive Extension
City Parish Project No: TBD
DOTD Project No: TBD
Design Engineer: TBD
Project Limits: Burbank Drive to Highland Road
Project Linear Footage: 1180
Detailed Description: The Seyburn Drive Extension is a new location roadway connecting Highland Road to Burbank Drive. The proposed typical section is a three lane curb and gutter roadway with sidewalks on both sides. Three locations for this new location roadway were considered, but the one contained in this report lines up with Seyburn Drive. This project would provide a vital link connecting the Highland Road corridor directly to Burbank Drive and would be located approximately one and a half miles east of Lee Drive, midway between Lee Drive and Staring Lane. This project would require a new bridge crossing Bayou Fountain.
Project Budget: Present Day Cost $4,297,577.00
Project Files:
Project
Summary
Photo
Gallery

PROJECT SCHEDULE
Planning 50% Design 0% ROW 0% Construction 0%
                                                                               
Project Progress: This project remains in the early planning stages.
Project Look Ahead: