Elm Grove Garden

PROJECT INFORMATION
Project ID: Y  Project Layout
Project Name: Elm Grove Garden
City Parish Project No: 06-CS-HC-0011
DOTD Project No: N/A
Design Engineer: Burk-Klienpeter, Inc.
Project Limits: 600' north of Fairchild Street to Rosenwald Road
Project Linear Footage: 2560
Detailed Description: This project will consist of replacing a narrow two lane open ditch roadway with a two lane curb and gutter roadway with sidewalks for safer access to the existing schools in the area.
Project Budget: Present Day Cost $2,583,200.00
Project Files:
Project
Summary
Photo
Gallery

PROJECT SCHEDULE
Planning 100% Design 100% ROW 100% Construction 40%
                         
Project Progress: The contractor has completed the north drainage system and is currently working on the south portion. Installation of curb and gutter and base course has begun.
Project Look Ahead: The contractor will continue with the installation of the drainage system and installation of road base.