| Project Limits: |
Burbank Drive to Highland Road |
| Project Linear Footage: |
2905 |
| Detailed Description: |
This project will provide a link from Essen-Staring Lane directly to Burbank Drive by adding an extension to Staring Lane. The right of way for this project has already been acquired by DOTD. Project features include construction of sound walls along the Highland Creek Subdivision that border the roadway right of way and a bridge crossing Bayou Fountain. It includes the Bayou Fountain channel re-alignment that parallels the roadway to minimize proposed bridge length crossing Bayou Fountain. It will provide an improved north-south corridor when combined with the proposed Staring Lane improvement project. |
| Project Budget: |
Present Day Cost $14,438,974.00
|
| Project Files: |
|
|