PROJECT PROGRESS



Siegen Lane

PROJECT INFORMATION
Project ID: X  Project Layout
Project Name: Siegen Lane
City Parish Project No: 06-CS-HC-0025
DOTD Project No: 817-40-0008 & 258-31-0016
Design Engineer: DMJM Harris, Inc.
Project Limits: Highland Road to 650' south of Perkins Road
Project Linear Footage: 6240
Detailed Description: Siegen Lane is currently a two lane roadway without shoulders from Burbank Drive to Perkins Road. The proposed typical section is a four lane curb and gutter roadway with a raised median and sidewalks on both sides. When combined with proposed improvement to Burbank Drive and an existing project on North Sherwood Forest, the project will provide a vital north-south / east-west link that will extend from Greenwell Springs Road south to Burbank Drive and then westward into the LSU and downtown area.
Project Budget: Present Day Cost $17,585,811.00
Project Files:
Project
Summary
Photo
Gallery

PROJECT SCHEDULE
Planning 100% Design 100% ROW 100% Construction 55%
                         
Project Progress: Contractor is paving the northbound lanes.
Project Look Ahead: Contractor to continue paving operation for the northbound lanes and complete drainage for the southbound lanes.

CONSTRUCTION INFORMATION
Contractor Name: Byron E. Talbot Contractor, Inc.
Construction Amount: $13,101,241.05
Construction Duration: 720 Calendar Days
Construction Start Date: 6/15/2009
Construction End Date: 6/22/2011